Complete packages, or the one line item you are short of.
Solar procurement fails in two places: components that do not match each other, and warranties that cannot be claimed. We quote around both.
Named manufacturer, named certification, named warranty.
We supply EPC contractors, installers and distributors with full system packages sized to a load profile, and equally supply single components to buyers filling a gap in an existing bill of quantities.
Every offer names the manufacturer, the model, the certification held (IEC 61215, IEC 61730, IEC 62109 and equivalents), the warranty period and who honours it. Where a tender requires a specific tier of manufacturer or a bankability rating, we quote to that requirement rather than around it.
What we need to quote
- System size in kWp, or quantity per component
- Application: on-grid, hybrid, off-grid or pumping
- Grid voltage and frequency at site
- Roof or ground mounting, and structure material
- Destination, required certification and delivery window
Components we supply
| Category | Products | Typical ratings |
|---|---|---|
| PV modules | Monocrystalline PERC, TOPCon, bifacial glass-glass, half-cut cell | 450 Wp – 700 Wp, 25-year performance warranty |
| On-grid inverters | String and central inverters, single and three phase | 3 kW – 250 kW |
| Hybrid & off-grid inverters | Battery-ready hybrid inverters, off-grid inverter/chargers | 3 kW – 50 kW |
| Battery storage | LiFePO4 rack and wall-mounted lithium batteries, tubular gel batteries | 48 V, 5 kWh – 100 kWh+ banks |
| Charge controllers | MPPT and PWM controllers | 30 A – 100 A |
| Mounting structures | Aluminium and hot-dip galvanised steel rooftop, ground-mount and carport structures | Tilt-adjustable, site-specific design |
| Balance of system | DC and AC cables, MC4 connectors, combiner boxes, surge protection, isolators, earthing | To IEC standards |
| Solar pumping | Solar pump inverters, submersible and surface DC/AC pumps | 0.75 kW – 75 kW |
| Solar lighting | Integrated and semi-integrated street lights, flood lights, poles | 20 W – 200 W |
| Monitoring | Data loggers, Wi-Fi / GPRS dongles, energy meters | Manufacturer platforms |
Freight decides whether a solar project is competitive.
Solar is high-volume, low-density cargo. We plan the loading before we quote the price.
- Quoted per Wp for modules and per unit for inverters and batteries
- FOB, CFR and CIF offers with container utilisation calculated per shipment
- Mixed loads across modules, inverters and BOS to fill a container efficiently
- Lithium batteries shipped with UN 38.3 test reports and MSDS
- Manufacturer warranty documents issued in the buyer’s name
3 – 20 kWp on-grid and hybrid packages with storage.
50 kWp to multi-MW rooftop and ground-mount supply.
Standalone systems with battery banks for remote sites and towers.
Solar pumping for irrigation and drinking water; street lighting.